MIPS Instructions - Measure Calculation

How to Use the Measure Calculation file

The Measure Calculation file was created to determine

  1. Performance based on the raw data from Quality Measure (QM) reports

  2. Performance on Promoting Interoperability (PI)

  3. Overall performance for QM, PI, and Improvement Activities

  4. Performance projection based on current performance and remaining time in the reporting period

This file is designed to be per provider using their top 6 performing QMs.

In order to create this file, you must first have the following:


INSTRUCTIONS FOR MEASURES YTD TAB

1. Paste measure values into the Year To Date columns of the Measure Calculation file.

Quality Measures:

  • Benchmark ID

  • Measure Name

  • Numerator and Denominator from WRS Report to auto-populate the % column
  • Exclude - denominator exclusion value from WRS Report
  • Decile # to auto-populate the Total Points column. Decile # is unique for each measure.

1597645091056-718.png

Promoting Interoperability

  • Numerator, Denominator, and Performance Rate values from WRS Report to auto-populate the % and Total Points columns.

1597645160128-780.png

2. Complete data in Projection Columns to to get the max projection score estimate for each measure. The projection is based on the following:

  • How many patients were seen for each measure up to the last day of the report date range
  • How many patients will be seen for each measure by the end of the performance period.

Quality Measures

1597645563295-203.png

  • Weeks Past - # of weeks that have passed (last week of current YTD range).
  • Weeks Remaining - # of weeks remaining in the current year
  • Decile - decile based on Proj Year % and benchmark file

Promoting Interoperability

  • Weeks Past - # of weeks that have passed (last week of current YTD range).
  • Weeks Remaining - # of weeks remaining in the current year

1597646387403-660.png

Projection also helps to determine which measures have the best opportunity for growth. Difference = Projected points - Total Points.

If a measure has a lower number in Difference, it will be less beneficial to push on that measure, whereas time would be better spent improving the performance of a measure with a larger
Difference.

1597646726500-428.png


OVERALL CALCULATION TAB

The Overall Calculation tab calculates the overall total performance for Quality Measures, Promoting Interoperability and Improvement Activities.

  • QM & PI content is pulled from the previous tab, so make sure the data entry is correct in the first tab.
  • All grey fields have calculations built in, DO NOT CHANGE THE CALCULATIONS without consulting your manager.

1597647256230-851.png

REWEIGHT FACTORS

There are exclusions and exceptions that permit re-weighting of certain measures into another, or entire categories into another. These reweights have a direct impact on the total performance as categories and individual measures carry different weight.

1597647282980-546.png

Each column has a comment on how the possible reweights can be used.

This is very important because utilizing these exclusions and exceptions can mean the difference between passing and failing.

INSTRUCTIONS FOR OVERALL CALCULATION TAB

1. Copy the decile points in Column B and Paste as Values to Column C. DO NOT COPY AND PASTE NORMALLY.

1597648058650-532.png

1597647952739-639.png

2. Copy the decile points in Column M and Paste as Values to Column N. DO NOT COPY AND PASTE NORMALLY.

1597648292740-115.png

3. In the Improvement Activities line, enter 40 in Columns B and M.

1597648170026-145.png


Provider Performance values

You Are Here = D26

Max Performance = O26